ULVAC DA-241 9.2 cfm Oil-Free Diaphragm Pump

Power Lab Supply 2SKU: DA-24103

Power option: 110V 60Hz
Pump accessory: KF/NW25 flange to 3/8" hose barb adapter
Price:
Sale price$3,362.05 USD
Description

Manufactured and imported directly from Japan, ULVAC DA series diaphragm pumps creates vacuum by reciprocate movement of rubber diaphragms. Various pumping speed and two/single stages are selectable depends on your required pressure and pumping volume. These pumps are oil-free, which means less maintenance and no more frequent and costly oil change, or cross contamination.

Ai is now the official dealer of ULVAC vacuum pumps. These pumps are made in Japan with one year warranty and technical support from ULVAC.

Applications

  • Alcohol evaporation
  • Vacuum chucks, wafer and tip handling devices
  • Vacuum tweezers, medical appliances
  • Printing equipment
  • Automatic packing machines
  • Optical appliances
  • Semiconductor industry

Free three feet ($19.99 value) included.

 



 

 

Specifications

 

 Model  ULVAC DA-241
 Electrical requirements
 110V 50/60Hz or 220V 50/60Hz single phase, 400 watts
 Full load current  6.0 amps
 Pumping rate
 9.2 cfm
 Ultimate vacuum level
 120 torr
 Inlet/Outlet
 5/8" hose barb
 Adjustable vac./gas ballast  No
 Unit/shipping dimensions (LxWxH)
 8 x 16 x 11" / 18/11/14.5"
 Unit/shipping weight
 58 Lb / 63 Lb
 Working environment  32°F to 104°F (0°C to 40°C)
 Noise level  70 dBA at near Atmospheric pressure
 65 dBA at ultimate pressure
 Certification  CE, TUV
Standard package

 

 Part description

 Quantity

Part image

 ULVAC DA-241 9.2 cfm oil-free diaphragm pump
1 pc

 

  (3 ft)
1 pc

 Power Cord with plug (may be hardwired to unit or with a detachable plug)
1 pc

 Threaded Hose Barbs (May be installed on the unit)
2 pc

 User's manual
1 pc

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

Payment & Security

Amazon American Express Apple Pay Diners Club Discover Google Pay Mastercard PayPal Shop Pay Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

You may also like

Recently viewed